Fujitsu M10-4 Service Manual page 156

Hide thumbs Also See for M10-4:
Table of Contents

Advertisement

Table 7-6     Active/hot replacement work procedure (for a PCI Express card)
Item
Work procedure
1
Opening the rack door
2
Checking the operating condition of the
system and the I/O device usage status
3
Releasing the assignment of a PCIe card
4
Enabling the removal of a faulty PCIe card
5
Lowering the cable support
6
Replacing a faulty PCIe card
7
Fixing the cable support
8
Incorporating the replacement PCIe card
9
Confirming that there is no problem with
the replacement FRU
10
Closing the rack door
142
Fujitsu M10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual ・ June 2023
Reference
"5.3 Checking the Operating Condition and Resource
Usage
Status"
"5.4.1 Releasing the assignment of I/O
"5.4.2 Enabling the removal of an I/O
"5.9.2 Lowering the cable
"Chapter 8 Maintaining the PCI Express
"6.1.2 Fixing the cable
support"
"6.5.2 Incorporating an I/O
"6.3.3 Checking the FRU status after
devices"
device"
support"
Cards"
device"
maintenance"

Advertisement

Table of Contents
loading

This manual is also suitable for:

M10-4sSparc m10-4Sparc m10-4s

Table of Contents