Conditions List
appears.
2. Select the condition by tapping the button
of the copy source conditions.
3. Next, select the condition by tapping the
copy destination condition.
5. When the [Yes] button is tapped, the data
is copied. (To abort copying, tap the [No]
button.)
Last condition has
the highest priority
1. Tap the condition whose
priority you want to change
priority [ ] or [ ] button. (The
last condition has the highest
priority.)
*The initial setting condition
cannot be moved. It has the
lowest priority.
Currently selected condition name
The ON/OFF switch of
condition is chosen.
1. Switch to the condition you want to set.
3. Use the value input buttons to set the delay.
< Model menu (Common Functions) >
1 . S e l e c t t h e c o n d i t i o n b y
tapping the condition you
List.
2. Tap the [Remove] button.
3. When the [Yes] button is
t a p p e d , t h e c o n d i t i o n i s
reset. (To abort resetting, tap
the [No] button.)
● Group/single mode switching (Gr./Sngl)
(For a description of the operation
method, see the description at the
back of this manual.)
want to set.
123