Commissioning

12.1

Overview

Introduction
This section includes information on the following topics:
• Check before powering on for the first time
• Procedure for commissioning the S7-1500 automation system
– Removing/inserting the SIMATIC memory card
– First power-on of the CPU
• Procedure for commissioning the S7-1500 distributed I/O system
– First power-on of the ET 200MP on PROFINET IO
– First power-on of the ET 200MP on PROFIBUS DP
• Operating modes of the CPU STARTUP, STOP, RUN and operating mode transitions
• CPU memory reset: Automatic and manual
• Backing up and restoring the CPU configuration
• Time synchronization
• Identification and maintenance data
• Shared commissioning of projects
Commissioning requirements
Note
Performing tests
You must ensure the safety of your plant. You therefore need to perform a complete
functional test and the necessary safety checks before the final commissioning of a plant.
Also allow for any possible foreseeable errors in the tests. This avoids endangering persons or
equipment during operation.
Note
Check coding element in the I/O module
Make sure that the coding element is present in the I/O module before you plug in the front
connector for the first time. This reduces the risk of plugging a wired front connector into the
wrong type of module when replacing a module.