AC–20
New Gasket
Control Unit
AIR CONDITIONING
REASSEMBLY
1.
Align slot on heat exchanger (arrow) with lug in jacket.
I12452
2.
Install a new gasket and the combustion chamber.
3.
(a)
(b)
I12451
4.
(a)
(b)
I12449
5.
(a)
(b)
(c)
Cover
I12447
6.
Install the blower cover with the 4 screws.
I12446
–
COMBUSTION TYPE POWER HEATER
INSTALL HEAT EXCHAMBER
INSTALL COMBUSTION CHAMBER WITH FLAME
TUBE
INSTALL ELECTRIC MOTOR
Install a new gasket.
Install the electric motor with the 3 screws.
INSTALL CABLE HARNESS
Install the water temperature sensor and over heat sen-
sor.
Install the plate with the screw.
INSTALL COVER AND CONTROL UNIT
Install the cover and control unit.
Install the 2 hexagon screws.
Install the 2 screws.
INSTALL BLOWER COVER
AC2A0–01