less. First, consult your heater instruction
documentation and determine if your
heater requires a cool down period prior to
turning off the filter pump. Then refer to the
appropriate instructions below to connect
your heater.
If Cool Down Period Is Required
When the heater manufacturer requires a
cool down period, you must install, or have
installed, a Three Circuit Clock Mechanism
(P1353ME) in your installation. The
P1353ME needs to be wired in series with
the Panel Mount Transceiver in order for the
cool down feature to work properly. Refer to
the diagram and instructions below for
connecting both the Panel Mount Receiver
(PE650) and Three Circuit Clock Mechanism
to your heater. Refer to the Cool Down
Programming instructions in your P1353ME
manual for cool down programming setup.
1.
Connect one of the brown wires coming
from the Panel-Mounted Transceiver
Providing a brighter solution.™
Install Panel-Mounted Transceiver
11