Installing Options and Accessories
Figure 34. Powerware Hot Sync CAN Bridge Card.
NOTE
To install the card:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7 UPS Operating Instructions
2.
Unfasten the front door latch and swing the door open (see
3.
If installing interface wiring through the left interface entry conduit landing, proceed to Step 4; otherwise,
proceed to Step 6.
4.
Remove one top screw and two bottom screws securing the UPS left front panel (see
panel straight up to remove it from the panel hanger bracket at the top of the cabinet.
5.
Remove the screws securing the internal safety shield panel and remove the panel. Retain the hardware
for later use.
6.
Install the Powerware Hot Sync CAN Bridge Card into an open X-Slot communication bay on the front of
the UPS. See
To locate the appropriate terminals on the Powerware Hot Sync CAN Bridge Card, see
Table
23.
74
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 14
Only one Powerware Hot Sync CAN Bridge Card can be installed in the UPS. Multiple
CAN cards are not supported and will cause system conflicts.
for shutdown instructions.
Figure 23
and
Figure 29
for X-Slot communication bay locations.
Plug-in Terminal
Block J3
Figure
12).
Figure
12. Lift the
Figure 35