To prevent damage to the wiring channel and wiring in the UPS cabinet base when lifting or moving the
cabinet:
Lift and move the cabinet using only the front or rear forklift slots.
Verify that the forklift forks are in a horizontal position before inserting them into the forklift slots. DO NOT
angle fork tips upward.
Insert the forks all the way through the base. DO NOT insert forks partially into the base to move the
cabinet.
Forks may be partially inserted into the front or rear forklift slots for minor positioning if the forks are kept
in a horizontal position with no upward angling.
DO NOT use the forklift slots on the end of the cabinet to move the cabinet.
End forklift slots may be used for minor positioning if the forks are kept in a horizontal position with no
upward angling.
If these instructions are not followed, damage to the wiring channel and wiring will occur.
1.
Carefully inspect the outer packaging for evidence of damage during transit.
Do not install a damaged cabinet. Report any damage to the carrier and contact an Eaton service representative
immediately.
NOTE
For the following step, verify that the forklift or pallet jack is rated to handle the weight
of the cabinet (see
2.
Use a forklift or pallet jack to move the packaged cabinet to the installation site, or as close as possible,
before unpacking. If possible, move the cabinet using the pallet. Insert the forklift or pallet jack forks from
the right side of the pallet (facing the cabinet), between the supports on the bottom of the pallet (see
Figure 8
for the UPS cabinet center of gravity measurements). If the cabinet must be moved using the
cabinet front or rear fork lift slots, see the caution statement at the beginning of this procedure.
Do not tilt the UPS cabinet more than 10º from vertical or the cabinet may tip over.
3.
Set the pallet on a firm, level surface, allowing a minimum clearance of 3m (10 ft) on each side for
removing the cabinet from the pallet.
NOTE
The UPS cabinet is shipped with a debris shield covering the ventilation grill on top of
the unit. Do not remove the debris shield until installation is complete.
4.
Remove the protective covering from the cabinet.
5.
Remove the packing material, and discard or recycle in a responsible manner.
6.
Inspect the contents for any evidence of physical damage, and compare each item with the Bill of Lading.
If damage has occurred or shortages are evident, contact an Eaton service representative immediately to
determine the extent of the damage and its impact on further installation.
UPS Cabinet Maximum Weights
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 14
UPS Installation Plan and Unpacking
for cabinet weight).