C C h h a a p p t t e e r r 7 7 U U P P S S O O p p e e r r a a t t i i n n g g I I n n s s t t r r u u c c t t i i o o n n s s
This section describes how to operate the UPS using either the older LCD non-touch panel or the newer color
touchscreen control.
Refer to Section
the appropriate item. This section describes how to operate the UPS.
7 7 . . 1 1
U U P P S S C C o o n n t t r r o o l l s s a a n n d d I I n n d d i i c c a a t t o o r r s s
The controls and indicators identified and described in this section are used to control and monitor UPS
operation.
7.2 Using the LCD Control Panel
NOTE 1
Before starting the UPS, ensure all installation tasks are complete and a preliminary
startup has been performed by authorized service personnel. The preliminary startup
verifies all electrical interconnections to ensure the installation was successful and the
system operates properly.
NOTE 2
Read this section of the manual and have thorough knowledge of UPS operation before
attempting to operate any of the controls.
NOTE 3
The UPS displays 2 minutes of battery runtime at the initial startup. After a 24-hour
charging period, the UPS automatically runs a battery test and the correct battery
runtime displays.
Figure 63
shows the controls and indicators.
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 14
or Section
7.6 Using the Color Touchscreen Control Panel