Eaton Power Xpert 9395 550/275 Installation And Operation Manual page 49

Hide thumbs Also See for Power Xpert 9395 550/275:
Table of Contents

Advertisement

UPS Installation Plan and Unpacking
Table 7. Input/Output Ratings and External Wiring Requirements for the Power Xpert 9395-550/275 – 480V, Separate
Battery
Basic Unit Rating
Input and Output Voltage
AC Input to UPS Rectifier (0.98 Minimum pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
Minimum Conductor Size
Number per Phase
AC Input to UPS Bypass (Four Wire)
Full Load Current
(3) Phases, (1) Ground
Minimum Conductor Size
Number per Phase
AC Input to UPS Bypass (Five Wire)
Full Load Current
(3) Phases, (1) Neutral, (1) Ground
Minimum Conductor Size
Number per Phase
DC Input from Each Battery Cabinet to UPS or
Battery Disconnect
(1) Positive, (1) Negative
Minimum Conductor Size
Number per Pole
DC Input from Battery Disconnect to UPS
(1) Positive, (1) Negative
Minimum Conductor Size
Number per Pole
AC Output to Critical Load (Four Wire)
Full Load Current
(3) Phases, (1) Ground
Minimum Conductor Size
Number per Pole
28
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 14
Units
kVA
225
kW
205
Volts
480/480 480/480 480/480 480/400
Amps
309
A
AWG or kcmil
350
(3)
(each)
Amps
325
B
AWG or kcmil
350
(each)
(3)
Amps
271
B
AWG or kcmil
300
(each)
(4)
Total Amps
451
C
AWG or kcmil
500
(each)
(1)
Total Amps
451
C
AWG or kcmil
250
(3)
(each)
Amps
271
D
AWG or kcmil
350
(each)
(3)
Rating 50/60 Hz
225
450
500
250
410
455
480/480
377
617
686
350
350
350
(3)
(3)
(3)
397
650
722
350
350
350
(3)
(3)
(3)
331
541
601
300
300
300
(4)
(4)
(4)
551
902
1002
500
500
500
(1)
(1)
(1)
551
902
1002
250
250
250
(3)
(3)
(3)
331
541
601
350
350
350
(3)
(3)
(3)
550
501
754
350
(3)
662
350
(3)
662
300
(4)
1103
500
(1)
1103
250
(3)
662
350
(3)

Advertisement

Table of Contents
loading

Table of Contents