Installing Options and Accessories
7.
Install wiring between the UPS and SCM II. See
Bridge Card terminal location and wiring information, and
terminal location and wiring information.
NOTE
8.
Install 120 Vac power wiring from the critical bus to the SCM II. See
the terminal location and wiring information.

Figure 43. Supervisory Contact Module II Terminal Location.

Ground
Terminal
Terminal TB2 Customer
Supervisory Contact Interface
Terminal TB1 Signal
Connections from the UPS
NOTE
9.
Install wiring between the SCM II terminal block TB2 and the monitoring equipment. See
terminal block location and
10. Close the front door and secure the latch.
11. If removed, reinstall the safety shield panel removed in paragraph
5.1 Installing an Optional Powerware Hot Sync CAN Bridge
hardware.
12. If removed, reinstall the left front panel removed in paragraph
5.1 Installing an Optional Powerware Hot Sync CAN Bridge
hardware.
13. Restart the UPS. See
86
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 14
120 Vac for the SCM II should be supplied from the critical bus by facility planners or the
customer.
Terminal TB3
120 Vac Power
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative
to schedule a date.
Figure 44
for terminal assignments.
Chapter 7 UPS Operating Instructions
Figure 35
and
Table 23
for the Powerware Hot Sync CAN
Figure
43,
Figure
41, and
Figure
43,
Card, Step 5. Secure with the retained
Card, Step 4 and secure with the retained
for startup instructions.
Table 27
for the SCM II
Figure
41, and
Table 27
for
Figure 43
for

Advertisement

Table of Contents
loading

Table of Contents