Figure 40. Remote Monitor Panel Ii And Remote Monitor Panel Ii Terminal Locations - Eaton Power Xpert 9395 550/275 Installation And Operation Manual

Hide thumbs Also See for Power Xpert 9395 550/275:
Table of Contents

Advertisement

Installing Options and Accessories
4.
Remove the UPS cabinet top interface conduit landing plates to drill or punch conduit holes (see
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and RMP II. See
7.
Install wiring between the UPS and RMP II. See
Bridge Card terminal location and wiring information, and
the RMP II terminal location and wiring information.
NOTE
8.
Install 120 Vac power wiring from the critical bus to the RMP II. See
the terminal location and wiring information.
9.
Close the front door and secure the latch.
10. If removed, reinstall the safety shield panel removed in paragraph
5.1 Installing an Optional Powerware Hot Sync CAN Bridge
hardware.
11. If removed, reinstall the left front panel removed in paragraph
5.1 Installing an Optional Powerware Hot Sync CAN Bridge
hardware.
12. Restart the UPS. See

Figure 40. Remote Monitor Panel II and Remote Monitor Panel II Terminal Locations

Terminal TB1
Signal Connections
from the UPS
82
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 14
120 Vac for the RMP II should be supplied from the critical bus by facility planners or the
customer.
Chapter 7 UPS Operating Instructions
Figure 45
for RMP II knockout hole location.
Figure 35
and
Table 23
for the Powerware Hot Sync CAN
Figure 40,Figure 40 Figure
Figure
40,
Card, Step 5. Secure with the retained
Card, Step 4 and secure with the retained
for startup instructions.
Ground
Terminal
Terminal TB3
120 Vac Power
Figure
15).
41, and
Table 27
for
Figure
41, and
Table 27
for

Advertisement

Table of Contents
loading

Table of Contents