Eaton Power Xpert 9395 550/275 Installation And Operation Manual page 47

Hide thumbs Also See for Power Xpert 9395 550/275:
Table of Contents

Advertisement

UPS Installation Plan and Unpacking
Table 6. Input/Output Ratings and External Wiring Requirements for the Power Xpert 9395-550/275 – 400V, Common
Battery
Basic Unit Rating
Input and Output Voltage
AC Input to UPS Rectifier (0.98 Minimum pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
Minimum Conductor Size
Number per Phase
AC Input to UPS Bypass (Four Wire)
Full Load Current
(3) Phases, (1) Ground
Minimum Conductor Size
Number per Phase
AC Input to UPS Bypass (Five Wire)
Full Load Current
(3) Phases, (1) Neutral, (1) Ground
Minimum Conductor Size
Number per Phase
DC Input from Each Battery Cabinet to UPS or
Battery Disconnect
(1) Positive, (1) Negative
Minimum Conductor Size
Number per Pole
DC Input from Each Battery Disconnect to Each
UPS UPM
(1) Positive, (1) Negative
Minimum Conductor Size
Number per Pole
AC Output to Critical Load (Four Wire)
Full Load Current
(3) Phases, (1) Ground
Minimum Conductor Size
Number per Pole
26
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 14
Units
kVA
225
kW
205
Volts
400/400 400/400 400/400 400/400
Amps
370
A
AWG or kcmil
300
(4)
(each)
Amps
325
B
AWG or kcmil
350
(each)
(3)
Amps
325
B
AWG or kcmil
500
(each)
(3)
Total Amps
451
C
AWG or kcmil
500
(each)
(1)
Total Amps
451
C
350
AWG or kcmil
(each)
(6)
Amps
325
D
350
AWG or kcmil
(each)
(3)
Rating 50/60 Hz
275
450
500
250
409
455
400/400
453
741
823
300
300
300
(4)
(4)
(4)
397
650
722
350
350
350
(3)
(3)
(3)
397
650
722
500
500
500
(3)
(3)
(3)
551
902
1002
500
500
500
(1)
(1)
(1)
551
902
1002
350
350
350
(6)
(6)
(6)
397
650
722
350
350
350
(3)
(3)
(3)
550
500
905
300
(4)
794
350
(3)
794
500
(3)
1103
500
(1)
1103
350
(6)
794
350
(3)