Installing Options and Accessories
5 5 . . 4 4
I I n n s s t t a a l l l l i i n n g g a a n n O O p p t t i i o o n n a a l l R R e e l l a a y y I I n n t t e e r r f f a a c c e e M M o o d d u u l l e e I I I I
To install RIM II wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7 UPS Operating Instructions
2.
Perform the procedure listed in paragraph
5.1 Installing an Optional Powerware Hot Sync CAN Bridge
NOTE
3.
Securely mount the RIM II at the desired location. See
NOTE
4.
Remove the UPS cabinet top interface conduit landing plates to drill or punch conduit holes (see
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and RIM II. See
7.
Install wiring between the UPS and RIM II. See
Bridge Card terminal location and wiring information, and
terminal location and wiring information.
NOTE
8.
Install 120 Vac power wiring from the critical bus to the RIM II. See
the terminal location and wiring information.
9.
Close the front door and secure the latch.
10. If removed, reinstall the safety shield panel removed in paragraph
5.2 Installing Distributed Bypass Control
11. If removed, reinstall the left front panel removed in paragraph
5.2 Installing Distributed Bypass Control
12. Restart the UPS. See
NOTE
13. Contact an Eaton service representative for verification and testing of the RIM II and its connections prior
to making connections with J1 through J4 (see
You can order interface cables separately for connecting to the 15–Pin D–Sub Connectors.
84
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 14
for shutdown instructions.
If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the
wall. Do not use hollow wall anchors.
When installing signal wiring for CAN card J3 terminals, conduit must be installed
between the device and the UPS cabinet.
120 Vac for the RIM II should be supplied from the critical bus by facility planners or the
customer.
Wiring, Step 5. Secure with the retained hardware.
Wiring, Step 4 and secure with the retained hardware.
Chapter 7 UPS Operating Instructions
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative
to schedule a date.
Card.
Figure 46
for mounting hole locations.
Figure 46
for RIM II knockout hole location.
Figure 35
and
Table 23
for the Powerware Hot Sync CAN
Figure
40,
Figure
Figure
for startup instructions.
Table 28
and
Figure
42).
Figure
41, and
Table 27
for the RIM II
40,
Figure
41, and
Table 27
15).
for

Advertisement

Table of Contents
loading

Table of Contents