Site Inspection Checklist - Nortel CallPilot Installation And Configuration Manual

Hide thumbs Also See for CallPilot:
Table of Contents

Advertisement

Before you begin

Site inspection checklist

Before you perform hardware installation, complete the following site inspection
checklist:
Check
Description
Ensure that the area is clean and clear of any debris.
Ensure that there is adequate space for all equipment.
Ensure that there is a desk, shelf, or table available for the monitor,
keyboard, mouse, and modem.
Ensure that there is adequate air-flow room around the peripheral
equipment for ventilation.
Ensure that there are no heat sources near the peripheral equipment.
Ensure that an analog phone line is available for the modem.
Ensure that the area is isolated from strong electromagnetic fields and
electrical noise sources (such as air conditioners, large fans, motors,
radio or TV transmitters, or high-frequency security devices).
Ensure that there is a sufficient number of adequate grounded electrical
outlets or power bars for all equipment. There should be one outlet for
each of the following:
Ensure that jacks and cables are ready for all required connections.
Obtain the following for all equipment on both the CLAN and the
ELAN:
12
monitor (for temporary connection)
modem
CD-ROM drive
tape drive (optional)
embedded LAN (ELAN) hub
administration PC and monitor
customer-supplied network equipment (if required)
unique computer names
IP addresses
subnet masks
Standard 1.0
CallPilot

Advertisement

Table of Contents
loading

This manual is also suitable for:

201i

Table of Contents