Fresenius Medical Care 4008 E Technical Manual page 76

Hemodialysis machine
Table of Contents

Advertisement

Rinse required !
Rinse after Disinf.
Power Failure
BIBAG connect. open Upon start of a cleaning program
Heater error
Accumulator empty!
During stored mandatory rinse in Dis I to V.
The mandatory rinse has been interrupted (e.g. the machine has been
switched off).
Selection of a cleaning program, although a mandatory rinse has been
requested in HR.
A disinfection program has been stopped and subsequently a rinsing or
hot rinsing program started.
During a cleaning program
in RI I to II, HR I to III, Dis I to V.
Line voltage failed.
in RI I to II, HR I to III, Dis I to V.
The BIBAG connector is not closed (cap not attached).
During the CDS rinsing phase at the end of a hot rinsing program or a
hot disinfection program in CDS: HR I to III, Dis II to IV.
The heater signal (P.C.B. LP 633: X633R/A26) is not changing for > 40
sec.
Battery voltage <17.2 V ±2.5 %
Only in the event of a power failure during the cleaning programs.
If the voltage drops below 17 V, the machine will switch off.
Fresenius Medical Care 4008 4/08.03 (TM)
1-69

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4008 b4008 h4008 s

Table of Contents