Number
1
1
Approx.
2 m
2
1
2.1.2
Mounting the ET 200M
Procedure
1. Mount the rail on a firm base so that there is at least 40 mm clearance above and below
2. Starting from the left side, mount the individual modules on the rail (plug in the bus
3. Set PROFIBUS address 3 on the interface module IM 153-2.
ET 200M
Operating Instructions, 12/2008, EWA-4NEB780600602-08
Item
Side cutters and wire stripping tools
Tool for crimping wire-end ferrules
Stranded wire with 1 mm
appropriate wire end ferrules, type A, length 6 mm
one-pin on button
24 V indicator lamp
the rail.
connectors (not for PS 307 and the last module) – engage – swing in – screw down).
Observe the following sequence:
– Power supply PS 307
– Interface module IM 153-2
– DI module SM 321
– DO module SM 322
Figure 2-2
Setting PROFIBUS address 3
2.1 Commissioning on PROFIBUS DP
cross section with
2
Brief instructions on commissioning
Order number (Siemens)
commonly available
commonly available
commonly available
commonly available
commonly available
23