Ups System Installation; Preliminary Installation Information; Unloading The Isbm With Upm Section From The Pallet - Eaton Power Xpert 9395P-900 Series Installation And Operation Manual

High performance ups
Hide thumbs Also See for Power Xpert 9395P-900 Series:
Table of Contents

Advertisement

Chapter 4

UPS System Installation

4.1

Preliminary Installation Information

Installation should be performed only by qualified personnel.
L 'installation ne doit être effectuée que par du personnel qualifié.
Refer to the following while installing the UPS system:
Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and installation notes.
l
Do not tilt the cabinets more than 10° during installation.
l
Remove the conduit landing plates to add conduit landing holes as required. Plate material is 16 gauge steel
l
(1.5 mm/0.06" thick).
If perforated floor tiles are required for ventilation, place them in front of the UPS.
l
4.2

Unloading the ISBM with UPM Section from the Pallet

The ISBM cabinets with a UPM or UPMs are joined and bolted to a wooden pallet supported by wood skids.
They are referred to as the UPS.
The ISBM with UPM or UPMs section is heavy (see Table 3-1). If unpacking and unloading
instructions are not closely followed, the cabinets may tip and cause serious injury.
Les sections de l'onduleur sont lourdes (voir le tableau 3-1). Suivre attentivement les instructions
de déchargement et de déballage pour éviter de renverser les armoires, ce qui pourrait causer de
graves blessures.
Do not tilt cabinets more than 10° from vertical.
l
Lift the cabinets only with a forklift or damage may occur.
l
Eaton
®
®
Power Xpert
9395P-900 UPS Installation and Operation Manual P-164000501—Rev 09
WARNING
AVERTISSEMENT!
WARNING
AVERTISSEMENT!
CAUTION
www.eaton.com/powerquality
4-1

Advertisement

Table of Contents
loading