Chapter 7
UPS Operating Instructions
This section describes how to operate the UPS.
7.1
UPS Controls and Indicators
The controls and indicators identified and described in this section are used to control and monitor UPS
operation. Figure 7-1 Identifies the touchscreen control panel and the location of the CB1 circuit breaker
(optional).
ISBM
Figure 7-1. UPS Controls and Indicators
7.1.1
Control Panel
The control panel is used to set up and control the UPS, and to monitor UPS operation. For a description of the
UPS control panel functions, see paragraph 7.3.
Eaton
NOTE
Before starting the UPS, ensure all installation tasks are complete and a preliminary
startup has been performed by authorized service personnel. The preliminary
startup verifies all electrical interconnections to ensure the installation was
successful and the system operates properly
NOTE
Read this section of the manual and have thorough knowledge of UPS operation
before attempting to operate any of the controls.
NOTE
The UPS displays two minutes of battery runtime at the initial startup. After a
24-hour charging period, the UPS automatically runs a battery test and the correct
battery runtime displays
For 4-wire
systems only
AC Input Breaker
CB1 (optional)
®
®
Power Xpert
9395P-900 UPS Installation and Operation Manual P-164000501—Rev 09
Touchscreen
Control Panel
ISBM
(Right Door
Removed)
www.eaton.com/powerquality
For 4-wire
systems only
7-1