UPS System Installation
4.11
Installing Options, Accessories, and Distributed Bypass Control Wiring
To install options, accessories, and distributed bypass control wiring, see Chapter 5, "Installing Options and
Accessories".
4.12
Initial Startup
Startup and operational checks must be performed by an authorized Eaton Customer Service Engineer, or the
warranty terms become void (see Section 1.10). This service is offered as part of the sales contract for the UPS
system. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve
a preferred startup date.
4.13
Completing the Installation Checklist
The final step in installing the UPS system is completing the following Installation
Checklist. This checklist ensures that you have completely installed all hardware, cables, and other equipment.
Complete all items listed on the checklist to ensure a smooth installation. Make a copy of the Installation
Checklist before filling it out, and retain the original.
After the installation is complete, an Eaton Customer Service Engineer must verify the operation of the UPS
system and commission it to support the critical load. The service representative cannot perform any
installation tasks other than verifying software and operating setup parameters. Service personnel may request
a copy of the completed Installation Checklist to verify all applicable equipment installations have been
completed.
NOTE
®
4-38
Eaton
Power Xpert
The Installation Checklist MUST be completed prior to starting the UPS system for
the first time.
®
9395P-900 UPS Installation and Operation Manual P-164000501—Rev 09
www.eaton.com/powerquality