Figure 4-5. Section Joining - Eaton Power Xpert 9395P-900 Series Installation And Operation Manual

High performance ups
Hide thumbs Also See for Power Xpert 9395P-900 Series:
Table of Contents

Advertisement

Left Top Panel
Left Middle Panel
Interior Left
Side Panel
Corner Channel

Figure 4-5. Section Joining

5.
Remove the screws securing the left top panel and remove the panel (see Figure 4-5). Retain the
hardware for later use.
6.
Remove the screws securing the left middle panel and remove the panel (see Figure 4-5). Retain the
hardware for later use.
Use care during installation to protect components mounted on the right side of the ISBM section
and the intercabinet wiring harnesses attached to the left side UPM section from damage.
Lors de l'installation, prendre soin de protéger les composantes du côté droit du module de
contournement de système intégré (ISBM) et les faisceaux de câbles reliant les armoires du côté
gauche du module d'alimentation universel (UPM).
NOTE
Clearance between the ISBM and the UPM sections must be less than 1/2" so that
joining brackets can be installed.
®
®
Eaton
Power Xpert
9395P-900 UPS Installation and Operation Manual P-164000501—Rev 09
Wireway Panel
CAUTION
ATTENTION!
www.eaton.com/powerquality
UPS System Installation
UPM Section
4-7

Advertisement

Table of Contents
loading

Table of Contents