11. To check the operation of the RMP II, ensure that the UPS is supplying the load via inverter or bypass. If
the indicators on the RMP II show the appropriate status, then it is operating correctly.
If the communication link between the UPS and the RMP II is not present, the RMP II performs a self-test
(all indicators flash and the horn beeps at one-second intervals). If the self-test occurs, check all harness
connectors and the fuse for proper seating. If all connections are secure but the RMP II continues to
self-test, replace the fuse with the spare included in the hardware kit. If a fuse replacement does not
correct the problem, contact an Eaton service representative for verification that the RMP II is working
correctly.
12. To test the indicator lamps, press and hold the horn silence pushbutton for three seconds. All lamps
should illuminate, and the horn sounds continuously until you release the pushbutton.
5.4

Installing an Optional Relay Interface Module II

To install RIM II wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See Chapter 7, "UPS Operating
Instructions" for shutdown instructions.
2.
Perform the procedure listed in paragraph 5.1.
3.
Securely mount the RIM II at the desired location. See Figure 5-13 for mounting hole locations.
4.
Remove the ISBM cabinet top right interface conduit landing plate to drill or punch conduit holes (see
Figure 4-16).
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and RIM II. See Figure 5-13 for RIM II knockout hole location.
7 .
Install wiring between the UPS and RIM II. See Figure 5-2 and Table 5-1 for the Hot Sync CAN Bridge
Card terminal location and wiring information, and Figure 5-7, Figure 5-8, and Table 5-5 for the RIM II
terminal location and wiring information.
8.
Install 120 Vac power wiring from the critical bus to the RIM II. See Figure 5-7, Figure 5-8, and Table 5-5
for the terminal location and wiring information.
9.
Close the front door and secure the latch.
10. Restart the UPS. See Chapter 7, "UPS Operating Instructions" for startup instructions.
Eaton
NOTE
Setup of the Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a
date.
NOTE
If mounting to a hollow wall, secure the enclosure to a wood or metal stud within
the wall. Do not use hollow wall anchors.
NOTE
When installing signal wiring for CAN card J3 terminals, conduit must be installed
between the device and the UPS cabinet.
NOTE
120 Vac for the RIM II should be supplied from the critical bus by facility planners or
the customer.
NOTE
Setup of the Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a
date.
®
®
Power Xpert
9395P-900 UPS Installation and Operation Manual P-164000501—Rev 09
Installing Options and Accessories
www.eaton.com/powerquality
5-11

Advertisement

Table of Contents
loading

Table of Contents