Chapter 4

UPS System Installation

4.1

Preliminary Installation Information

Installation should be performed only by qualified personnel.
Refer to the following while installing the UPS system:
Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and installation notes.
l
Do not tilt the cabinets more than
l
Remove conduit landing plates to add conduit landing holes as required.
l
If perforated floor tiles are required for ventilation, place them in front of the UPS.
l
4.2

Unloading the UPS Cabinet from the Pallet

The UPS cabinet is heavy (see Table 3-2). If unpacking and unloading instructions are not closely
followed, the cabinet may tip and cause serious injury.
Do not tilt cabinet more than 10° from vertical.
l
Lift the cabinets only with a forklift or damage may occur.
l
The UPS cabinet is bolted to a pallet consisting of four metal angle supports secured to two wood supports.
To remove the pallet:
1.
If not already accomplished, use a forklift or pallet jack to move the UPS cabinet to the installation area, or
as close as possible, before unloading from the pallet. Insert the forklift or pallet jack forks between the
supports on the bottom of the pallet (see Figure 3-6 or Figure 3-7 for the UPS cabinet center of gravity
measurements).
2.
Open the front door by lifting the latch from the bottom and turning to the right (counterclockwise) and
swing the door open.
3.
Locate the four 1/2" jacking bolts from the parts kit and install them in the threaded holes in the front and
rear supports as shown in Figure 4-1. Place a floor protector from the parts kit underneath each jacking
bolt, and screw the bolts down against them.
The floor protectors protect the floor from being marred by the jacking bolts.
Eaton 93PM UPS (20–50 kW, 480V Four Wire – 50 kW Frame) Installation and Operation Manual P-164000540—Rev 4
NOTE
For the following steps, verify that the forklift or pallet jack is rated to handle the
weight of the cabinet (see Table 3-2 for cabinet weight).
WARNING
±
10 during installation.
WARNING
CAUTION
www.eaton.com/powerquality
4-1