Figure 4-16. Isbm And Upm Section Conduit And Wire Entry Locations - Eaton Power Xpert 9395P-900 Series Installation And Operation Manual

High performance ups
Hide thumbs Also See for Power Xpert 9395P-900 Series:
Table of Contents

Advertisement

UPS System Installation
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
BOTTOM VIEW
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)

Figure 4-16. ISBM and UPM Section Conduit and Wire Entry Locations

®
4-20
Eaton
Power Xpert
®
9395P-900 UPS Installation and Operation Manual P-164000501—Rev 09
Front
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Front
www.eaton.com/powerquality

Advertisement

Table of Contents
loading

Table of Contents