Figure 4-2. Removing The Isbm Section Right Side Shipping Bracket - Eaton Power Xpert 9395P-900 Series Installation And Operation Manual

High performance ups
Hide thumbs Also See for Power Xpert 9395P-900 Series:
Table of Contents

Advertisement

UPS System Installation
ISBM Removable
Front Panels
Pallet

Figure 4-2. Removing the ISBM Section Right Side Shipping Bracket

4.
Using a forklift (see the caution statement at the beginning of this procedure), raise the cabinet until the
cabinet bottom clears the pallet by approximately 3 mm (1/8").
5.
Pull the pallet from under the cabinet. Discard or recycle the pallet and shipping brackets in a responsible
manner.
6.
Carefully lower the cabinet until the cabinet base contacts the floor.
7 .
Repeat Steps 2 through 6 for the remaining cabinet.
8.
Proceed to paragraph 4-3.
®
4-4
Eaton
Power Xpert
Right Side Shipping
Bracket
®
9395P-900 UPS Installation and Operation Manual P-164000501—Rev 09
For 4-wire
systems only
Shipping Bracket
Bolts
www.eaton.com/powerquality
Shipping Bracket
Bolts