Page 2
If not already accomplished, remove one top screw and two bottom screws securing each ISBM section left and right front panel (refer to the applicable Eaton 9395/9395P UPS manual for panel location). Lift the panels straight up to remove them from the panel hanger brackets at the top of the cabinet.
Page 3
Using tie wraps from the single-feed kit (see Table 1), secure cables to the internal cabinet divider (see Figure 1). Return to the applicable Eaton 9395/9395P UPS manual to complete the wiring. Use M12 60mm bolts from the single-feed kit (see Table 1) to install rectifier input lugs.