Siemens SIMATIC ET 200pro FC-2 Operating Instructions Manual page 145

Low voltage converter for the distributed i/o system
Hide thumbs Also See for SIMATIC ET 200pro FC-2:
Table of Contents

Advertisement

Table 7- 22
Parameter
p1120
p1121
p1130
p1131
p1134
p1135
p1136
p1137
You can find more information in function diagram 3070 and in the parameter list of the List
Manual.
Setting the extended ramp-function generator
Procedure
1. Enter the highest possible speed setpoint.
2. Switch on the motor.
SIMATIC ET 200pro FC-2 converter
Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257324B AF
Additional parameters to set the extended ramp-function generator
Description
Ramp-function generator, ramp-up time (factory setting depends on the Power Mod-
ule)
Duration of acceleration (in seconds) from zero speed to maximum speed P1082
Ramp-function generator, ramp-down time (factory setting depends on the Power
Module)
Braking time in seconds from the maximum speed down to standstill
Ramp-function generator initial rounding time (Factory setting depends on the Power
Module)
Initial rounding for extended ramp-function generator. The value applies for ramp up
and ramp down.
Ramp-function generator final rounding time (Factory setting depends on the Power
Module)
Final rounding for extended ramp-function generator. The value applies for ramp up
and ramp down.
Ramp-function rounding type (factory setting: 0)
0: Continuous smoothing
1: Discontinuous smoothing
OFF3 ramp-down time (factory setting depends on the Power Module)
OFF3 initial rounding time (Factory setting depends on the Power Module)
Initial rounding time for OFF3 for an extended ramp-function generator.
OFF3 final rounding time (factory setting: 0 s)
Final rounding for OFF3 for the extended ramp-function generator
Advanced commissioning
7.9 Setpoint calculation
143

Advertisement

Table of Contents
loading

Table of Contents