Table 30: Site Preparation Checklist (continued)
Item or Task
Measure distance between
external power sources and
services gateway
installation site.
Calculate the optical power
budget and optical power
margin.
SRX5600 Site Guidelines and Requirements
IN THIS SECTION
SRX5600 Services Gateway Environmental Specifications | 160
General Site Guidelines | 161
Site Electrical Wiring Guidelines | 162
Clearance Requirements for SRX5600 Services Gateway Airflow and Hardware Maintenance | 163
SRX5600 Services Gateway Environmental Specifications
Table 31 on page 161
specifies the environmental specifications required for normal services gateway
operation. In addition, the site should be as dust-free as possible.
For More Information ...
"Calculating Power Budget
for Fiber-Optic Cable for
the SRX5600 Services
Gateway" on
page 180,"Calculating Power
Margin for Fiber-Optic
Cable for the SRX5600
Services Gateway" on
page 181
Performed By
Date
160