PTX10003 Site Preparation Checklist

The checklist in
Table 21 on page 71
a PTX10003 installation.
Table 21: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as temperature
and humidity do not exceed router tolerances.
Power
Measure the distance between external power sources
and the router installation site.
Calculate the power consumption and requirements.
Rack
Verify that your rack meets the minimum requirements
for the installation of the router.
Plan rack location, including required space clearances.
Secure the rack to the floor and building structure.
Cables
Acquire cables and connectors:
Determine the number of cables needed based on
your planned configuration.
Review the maximum distance allowed for each cable.
Choose the length of cable based on the distance
between the hardware components being connected.
summarizes the tasks you need to perform when preparing a site for
For More Information
"PTX10003 Environmental
Requirements and Specifications"
on page 73
PTX10003 Power System on
page 50
"PTX10003 Rack Requirements"
on page 76
"PTX10003 Clearance
Requirements for Airflow and
Hardware Maintenance" on
page 75
See the
Hardware Compatibility
Tool.
Performed
by
Date
71