SMA SUNNY ISLAND 3.0M Operating Manual page 65

Sunny remote control
Hide thumbs Also See for SUNNY ISLAND 3.0M:
Table of Contents

Advertisement

SMA Solar Technology AG
No.
Name
F 364 PhsPwrFail
F 365 VAcExtPhsFail
F 366 HotAcBus
F 367 ExtCtcNotOpen
F 368 NRelNotOpen
W 369 NRelNotOpenSlv1
W 370 NRelNotOpenSlv2
Operating Manual
Level Cause
2
The Sunny Island system discon-
nects from the generator or util-
ity grid due to a voltage imbal-
ance between the line conduc-
tors.
3
Phase position of the measured
AC voltage at VExt and AC2
does not match at line conduc-
tor L1 (Master).
3
When the tie switch is open, AC
voltage is present at line con-
ductor L1 (Master).
3
Tie switch does not open.
3
Neutral conductor relay does
not open at L1 (Master).
1
Neutral conductor relay does
not open at L2 (slave 1).
1
Neutral conductor relay does
not open at L3 (slave 2).
10 Troubleshooting
Corrective measures
• Eliminate any faults in the
installation.
• Ensure that the neutral conductor
and line conductor are correctly
connected to connection ExtVtg.
• Ensure that the neutral conductor
and line conductor are correctly
connected to connection AC2.
• Ensure that connections ExtVtg and
AC2 are connected to the same
line conductor.
• Ensure that the triggering of the tie
switch is correct.
• Ensure that the tie switch is correctly
wired.
• Ensure that the triggering of the tie
switch is correct.
• Ensure that the tie switch is correctly
wired.
• Ensure that the feedback contact is
correctly connected.
• Contact the Service (see Section 16
"Contact", page 161).
SI30M-44M-60H-80H-BE-en-33
65

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny island 6.0hSunny island 4.4mSunny island 8.0h

Table of Contents