SMA Solar Technology AG
133# Gen State
No.
Name
133.01
GnDmdSrc
133.02
GnStt
133.03
GnRmgTm
133.04
GnRnStt
134# Device
No.
Name
134.01
ExtPwrAt
134.02
ExtVtg
Operating Manual
Description
Reason for requesting genera-
tor:
Generator state
Remaining minimum run time of
the generator in hh:mm:ss
Status of the digital input for
generator feedback (expert
mode)
Description
Total active power of the external grid connection at line conductor L1 in kW
Voltage of the external grid connection at line conductor L1 in V
13 Parameters in Sunny Remote Control
Value
Explanation
(Plain text
no.)
None (1)
No request
Bat (2)
State-of-charge-dependent re-
quest
Lod (3)
Load-dependent request
Tim (4)
Time-controlled request
Run1h (5)
Requested for 1 hour
Start (6)
Manually started
ExtSrcReq (7)
External generator request
Off (1)
Deactivated generator opera-
tion
Init (2)
Detecting generator
Ready (3)
Waiting for request (ready)
Warm (4)
Warming up
Connect (5)
Connecting
Run (6)
Operation
Retry (7)
Restarting
Disconnect (8)
Split
Cool (9)
Cooling down
Lock (10)
Locked after operation
Fail (11)
Error
FailLock (12)
Locked after error
Reinit (13)
Re-detection of the generator
Off (1)
Off
On (2)
On