Repeat the step drilling through the rollbar for both front lower mounts. After drilling each hole, put the bolt in
the hole so the rollbar stays in the correct location.
Drill the rear leg lower hole last making sure to drill through the frame mount.
407
www.factoryfive.com
508-291-3443