Replacing Dpp Probes Equipped With Crash Detection; Removing The Dpp Probe Cover - Siemens ADVIA 1800 Operator's Manual

Chemistry system
Table of Contents

Advertisement

13. In the Position probes for routine cleaning area, select
All probes (SPP, RPP1, and RPP2) move over cuvettes.
14. At the Operation Panel, select
water flow through the probe.
15. Verify that water is not leaking from the joint connector.

Replacing DPP probes equipped with crash detection

Materials required:
• Probes:
DPP
• Phillips screwdriver
• Pliers
• Lint-free towels
Time: 10 minutes
Analyzer mode: STANDBY
Figure 5-31. Dilution probe

Removing the DPP probe cover

1. Set the analyzer to Standby.
2. Using a Phillips screwdriver, remove the screws (
analyzer panel.
3. Push the DPP shield to the right and slowly lift it until it reaches approximately a 90°
angle, then gently lift the tab of the DPP shield and remove.
4. Unscrew all thumb screws and remove the splash guard protective covers from the
wash cups.
NOTE:
the splash guard protective cover.
Maintenance
-equipped for crash detection
(REF 00201578, PN 073-0223-02)
If the system includes an anti-rotation bracket, avoid hitting it while removing
Prime
,
PRIME 2
,
and then
BIOHAZARD
Wear personal protective equipment.
Use universal precautions.
1
) that secure the DPP shield to the
.
Start
Execute
to ensure proper
1
Dilution Probe (DPP)
163

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents