: For any maintenance procedures where you have to place the analyzer in
NOTE
STANDBY use System>Exit before you turn the analyzer off.
ISE maintenance schedule frequencies
As required
•
If you notice contamination in the lines, wash all lines.
•
Check and clean the cell tray (dilution bowl and nozzle).
•
If the slope or selectivity is incorrect, replace the bad electrode.
•
To prepare replacement electrodes for operation, condition the electrodes
If your laboratory runs dialysis samples, procedures with * should be
maintained as follows
•
500 or more a month, wash electrode lines every three days
•
100 or more a month, wash electrode lines once a week.
•
Less than 100 dialysis samples a month or 330 routine samples a day, wash electrode
lines once a month.
Many maintenance procedures require that you set the analyzer to Standby before
proceeding and after the procedure is complete, return the analyzer to the READY mode.
To set the analyzer to Standby, do the following:
1. Save all data and close all open windows on the workstation.
2. At the Menu Panel, select
After approximately 15 seconds, the Startup/Shutdown window opens.
3. On the analyzer power panel, turn the Operate/Standby switch to
To return the analyzer to the READY mode, do the following:
1. At the analyzer power panel, turn the Operate/Standby switch to
2. At the Startup/Shutdown window, select
3. Select
4. Enter the user name and password.
When Initialize displays in the Operation Panel modes field, select
5.
112
System(S)
.
OK
, then select
.
Exit(X)
.
Restart
ADVIA 1800 Operator's Guide
.
Standby
.
Operate
Initialize.