3. Loosen the lead wire connectors (
4. Unfasten the lamp screws (
housing.
5. When installing the new lamp, align the hole (
Figure 5-23. Locating pin
CAUTION
Do not touch the glass portion of the lamp. Touching the lamp could damage it. If
the lamp is dirty, clean it using lint-free toweling moistened with ethanol.
6. Install the lamp screws.
7. Install the lead wires and fasten the knobs.
8. Replace the access panel.
9. Return the analyzer to the
10. Wait 40 minutes for the lamp to stabilize.
NOTE:
11. Check the lamp energy (see the Weekly Maintenance section).
12. Register the data and verify that attenuations register at 100%, voltages are between
5–9, and scatter is no greater than ±40.
13. Perform the cell blank measurement test.
NOTE:
replaced.
14. Run QC controls to verify that all assays are within the laboratory's established
control ranges.
150
) on the plate (
3
CAUTION
Be careful not to drop the screws.
READY
You can perform the daily shutdown 2 while you are waiting.
Siemens recommends the assays on the system be calibrated after the lamp is
1
and
2
), then remove the wires.
) and remove the halogen lamp from the
4
1
) to the locating pin (
mode, if necessary.