16. FLM LIQUID COOLING CIRCUIT
About this chapter
This chapter describes how to diagnoses and to maintain the liquid cooling circuit of the FLM projector.
W
ARNING
W
ARNING
projector should have sufficiently cooled down (minimum 2 hours).
W
ARNING
vessel), unless stated explicitly in the servicing procedure.
Tools used in the liquid cooling servicing procedures
A
Image 16-1
A
Syringe with plastic tube (60 cm) and male valved fitting.
B
Two plastic tubes of 60 cm with male valved fitting.
C
60 cm plastic tube with female valved fitting.
D
Female valved fitting (to create female/female valved fitting adaptor).
E
Bottle with 1 liter cooling liquid.
F
Empty bottle with a volume of 1 liter.
G Air pump with Shrader type air hose fitting.
Order info liquid cooling
Order number
R395198K
B1909086K
Overview
•
Safety
•
Introduction
•
Diagnostics
•
Pressure verification of the liquid cooling circuit
•
Draining the liquid cooling circuit
•
Filling the liquid cooling circuit
•
Refreshing the liquid cooling circuit
•
Expelling air from the liquid cooling circuit
•
Pressurizing the liquid cooling circuit
•
Calibrating the liquid cooling circuit
R59770072 FLM SERIES 19/03/2007
:
All procedures in this chapter may only be performed by "qualified service technicians" .
:
All actions performed on the liquid cooling circuit should occur in ambient conditions (25°). The
:
Do not change the air pressure of a calibrated liquid cooling circuit (see marking on pressure
B
C
Description
Complete liquid cooling refill kit. Includes tubes, valved fittings, syringe, air pump, two plastic bottles of 1
liter filled with cooling liquid.
Four bottles of 1 liter filled with cooling liquid. (no additional tools)
D
E
1L
16. FLM liquid cooling circuit
F
G
153