Related
Documentation
Virtual Chassis Fabric Installation Overview
Copyright © 2017, Juniper Networks, Inc.
Use two people to attach the brackets to the posts.
6.
Have one person grasp both sides of the switch and lift it into place.
a.
Ensure that the switch is level. See
b.
Figure 53: Mounting the Switch on Two Posts in a Rack
Mounting rack
Have the second person use the four mounting screws (and cage nuts and washers
c.
if your rack requires them) to screw the mounting bracket to the rack.
Attach a ground cable to earth ground and then attach it to the chassis grounding
7.
points, as described in
"Connecting Earth Ground to a QFX5100 Device" on page
Rack-Mounting and Cabinet-Mounting Warnings on page 196
Connecting AC Power to a QFX5100 Device on page 111
Connecting Earth Ground to a QFX5100 Device on page 110
For best results, ensure you review and understand the Virtual Chassis Fabric (VCF)
configuration options. These configuration options are explained in Understanding Virtual
Chassis Fabric Configuration. Do not interconnect the switches with cables until directed
in the procedure.
Chapter 9: Unpacking and Mounting the Switch
Figure 53 on page
105.
Mounting bracket
110.
105