Table 24: Deployment Checklist (continued)
Item or Task
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor
and building structure.
Cables
Acquire cables and connectors:
Determine the number of cables
needed based on your planned
configuration.
Review the maximum distance
allowed for each cable. Choose the
length of cable based on the
distance between the hardware
components being connected.
Plan the cable routing and
management.
Related
Documentation

Rack Requirements for a QFX5100 Device

Copyright © 2017, Juniper Networks, Inc.
For More Information
"Clearance Requirements for Airflow and
Hardware Maintenance for a QFX5100 Device"
on page 71
Clearance Requirements for Airflow and
Hardware Maintenance for a QFX3600 or
QFX3600-I Device
Clearance Requirements for Airflow and
Hardware Maintenance for a QFX3500 Device
Clearance Requirements for Airflow and
Hardware Maintenance for EX4300 Switches
"Determining Interface Support for the
QFX5100 Device" on page 79
Determining Interface Support for the QFX3500
Device
Interface Support for the QFX3600 Device
Pluggable Transceivers Supported on EX4300
Switches
Site Preparation Checklist for a QFX5100 Device on page 63
Site Preparation Checklist for a QFX3600 or QFX3600-I Device
Site Preparation Checklist for a QFX3500 Device
Site Preparation Checklist for EX4300 Switches
All QFX5100 devices are designed to be installed on four-post racks. The QFX5100-96S
device can also be installed on two-post racks.
Rack requirements consist of:
Rack type
Mounting bracket hole spacing
Rack size and strength
Chapter 5: Preparation Overview
Performed By
Date
69