Buell 2002 P3 Service Manual page 347

Table of Contents

Advertisement

HOME
INSTALLATION
1.
With the lipped side facing inboard, install new camshaft
oil seal into gearcase cover, if removed. Press seal into
position until lightly bottomed.
2.
Install rotor cup.
a.
Apply LOCTITE THREADLOCKER 243 (blue) to
threads of screw.
b.
Position rotor cup onto end of camshaft aligning
notch with camshaft slot.
c.
Install screw to secure rotor cup. Tighten screw to
43-53 in-lbs (5-6 Nm).
3.
Install module plate with two screws.
4.
Install ignition module wiring terminals into correct posi-
tions in plug end of connector [10]. See Wiring Diagram.
Install pin terminals. See
CONNECTORS.
5.
See
Figure 7-17.
Mate connector [10] and install to T-
stud on frame backbone.
6.
Install locknut to clamp that secures hoses and wire har-
ness on right side of motorcycle.
7.
Install module plate with two screws. Do not tighten
screws.
8.
Install negative battery cable to battery terminal. Tighten
fastener to 60-96 in-lbs (7-11 Nm).
9.
Check ignition timing. See
10. Tighten module plate screws to 10-20 in-lbs (1-2 Nm).
11. Install new outer timer cover.
7-20
2002 Buell P3: Electrical
B.2 DEUTSCH ELECTRICAL
IGNITION
TIMING.
a0288x7x
Wire Harness
to Connector [10]
IGNITION MODULE CONNECTOR [10]
CHAMBER
WIRE COLOR
NUMBER
1
White/Black
2
Violet/White
3
Violet/Orange To Auto-Enrichener
4
Pink
*Lt Green/
Grey [10A]
5
*Tan/Yellow
[10B]
6
Black
Figure 7-20. Ignition Connector [10]
FUNCTION
To Ignition Switch
To TP Sensor
To Coil
To Sidestand Interlock
Ground

Advertisement

Table of Contents
loading

This manual is also suitable for:

Buell blast p3 2001

Table of Contents