TuffStuff AP-250S Owner's Manual page 16

Apollo 2-stack gym system
Table of Contents

Advertisement

C2
17
C3
IG. 52
Next, continue to route the
ulley 4 1/2 Rd. (#68-Labeled C3), then across and over the Pulley 4
/2 Rd. (#68-Labeled C4).
Note: Refer to the Cable Mapping Diagram on page 26 for
further detailed illustration of the
C7
C8
C6
C9
IG. 54
Route the
Lat Cable (#37)
abeled C7, C8). Next, locate one of the
Brackets (#26)
and continue to route the
nder the Pulley 4 1/2 Rd. (#68-Labeled C9), then up and over the
ulley 4 1/2 Rd. (#68-Labeled C10).
Note: Refer to the Cable Mapping Diagram on page 26 for
further detailed illustration of the
15
C4
37
28
3
Lat Cable (#37)
Lat Cable (#37)
routing.
5
36
C10
37
27
over the Pulleys 4 1/2 Rd. (#68-
Closed-End Double Pulley
Lat Cable (#37)
Lat Cable (#37)
routing.
17
around the
FIG. 53
1/2 Rd. (#68-Labeled C5), then through the
under the Pulley 4 1/2 Rd. (#68-Labeled C6).
Note: Refer to the Cable Mapping Diagram on page 26 fo
further detailed illustration of the
FIG. 55
Bar (#24)
down and
Washer 1/2" (#93).
Note: Refer to Fig. B on page 26 for further clarification of thi
hardware assembly.
Fully Fasten: Proceed to fully fasten this hardware assembly.
C5
C6
3
Next, continue to route the
Lat Cable (#37)
Lat Cable (#37)
37
Next, attach the
Lat Cable (#37)
using one Split Bolt 1/2-13 X 1 (#94), and one Split Loc
AP-250S_AP-250D Apollo 2-Stack Gym System
37
over the Pulley
Front Upright (#3)
an
routing.
24
to the
Top Plate/ Selecto

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap-250dApollo ap-2s0sApollo ap-250d

Table of Contents