TuffStuff AP-250S Owner's Manual page 9

Apollo 2-stack gym system
Table of Contents

Advertisement

144
IG. 24
Insert the
Left Pec Dec Arm (#7)
Cam Plate (#144)
into the receptacle of the
Repeat the same procedure for the
Note: It is recommended to grease both axles of the
Right Pec Dec Arms (#7,#6)
assembling.
8
6
IG. 26
Using a rubber mallet, insert a
#8), in the position as shown above, into the
Repeat the same procedure for the
AP-250S_AP-250D Apollo 2-Stack Gym System
3
7
6
144
along with the
Front Upright
Right Pec Dec Arm
(#6).
with multi-purpose grease prior to
8
7
Pec Dec Swivel Handle
Left Pec Dec Arm
Right Pec Dec Arm
(#6).
Aluminum
FIG. 25
(#3).
Hex Head Cap Screw 3/8-16 X 1 (#113), one Split Lock Washe
3/8" (#95), and one Fender Washer 3/8 X 1 1/2 (#92). Repeat th
same procedure for the
Left and
FIG. 27
(#7).
taining Snap Rings (#115). If possible, use Snap Ring Pliers for this job
as shown above. If the tool is not available, carefully work each Retainin
Snap Ring (#115) into the groove, then push up alternately with a screw
driver working the Retaining Snap Ring (#115) into the groove.
Note: Be careful not to distort the Retaining Snap Rings (#115) o
bend them.
Owner's Manual: Assembly Instructions
3
6
Secure the
Left Pec Dec Arm (#7)
Right Pec Dec Arm
8
8
7
115
Next, secure the
Pec Dec Swivel Handles (#8)
7
into place using on
(#6).
7
115
using two Re
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap-250dApollo ap-2s0sApollo ap-250d

Table of Contents