Installation and commissioning
● Connect the plug connectors of pedal 1 and if necessary the available foot switch
● Loosen screws 2, 3 and 4 and adjust the machine height by turning the crank 5.
● Tighten screws 2, 3 and 4 again.
8

Commissioning

.02
● Before commissioning the machine, clean it thoroughlyl, see Chapter 12 Care and Main-
● The machine, in particular the electric wires and pneumatic connection tubes, must be
● Have skilled personnel check if the machine can be operated with the available mains voltage.
● Connect machine to the compressed air system. The manometer on the air fi lter/lubrica-
22
2
1
Fig. 8 - 02
on the control unit.
tenance!
examined for any damage.
Do not operate the machine if there is any discrepancy!
The machine may only be connected to an earthed socket!
tor unit must display a pressure of 6 bar.
If necessary, set to the correct value (see chapter 12.05 Checking / regulating air com-
pression).