Set-Up And Initial Commissioning; Set-Up; Setting The Table Height - Pfaff 3819 series Instruction Manual

Table of Contents

Advertisement

Set-up and Initial Commissioning

8
Set-up and Initial Commissioning
8

Set-up

.01
Suitable electrical and pneumatic supply connections must be provided at the erection site,
see Chapter 3 Technical Data.
The erection site must have a fi rm and level subsurface and adequate lighting.
8

Setting the table height

.01.01
 Loosen the screws 1.
 Move the table top to the desired working height by pulling it out and pushing it in and
 Firmly tighten the screws 1.
20
The machine may only be set up and started up by qualifi ed personnel! All of
the relevant safety regulations must always be complied with in this process!
Adequate stability of the stand must be guaranteed, even during the sewing
operations.
The table top is lowered for packaging purposes.
The adjustment of the table height is described below.
Fig. 8 - 01
align the table top horizontally.
Adjust the stand on both sides evenly to prevent it tilting.
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

3819 -20/023819 -40/01

Table of Contents