Nikon SMZ25 Instruction Manual page 95

Research stereo microscope
Hide thumbs Also See for SMZ25:
Table of Contents

Advertisement

Cable routing
Route the cables before attaching the cover.
(In the figure, even though the relay box is already
attached for explanatory reasons, the attachment of
the relay box is explained in Step [5])
Bring out the cable from the SMZ zooming body
along the notch on the focus unit cover and connect
to the connector "ZOOM." Pass the cable from the
intelligent nosepiece through the oval hole on top of
the mount, bring it out along the notch on the top of
the left side cover, and then connect to the
connector "NP."
When the cable was connected to the motorized
focus unit, route the cable as shown in the figure.
Pass the cable from the motorized epi fluorescence
attachment through the oval hole at the top of the
mount, drop it down, and then connect to the
connector "FL."
(2)
Attach the left cover of the intelligent nosepiece.
Route the cable and replace the intelligent
nosepiece left side cover removed in Step [2]-(4).
Align and fit the two protrusions on the left side
cover to the two notches in the top center of the
intelligent nosepiece, insert the two M5 hexagon
socket head fixing bolts in the fixing bolt holes at the
bottom of the cover and firmly tighten them using a
hex driver (nominal designation: 4). After the
attachment, cover the bolt holes using the rubber
caps.
5
Attach the relay box. (P2-FU Focus Unit system only)
Attach the relay box to the P2-FU Focus Unit.
(1)
The relay box is provided with the box itself with the
attaching arm removed. Assemble the box and arm
before attaching.
The orientation of the joint is such that the signal
cables come out from the right side (as viewed from
the front) with the relay box attached to the focus
unit. Align the box with the two attachment arm
screw holes and attach it by tightening the M5
hexagon socket head bolts supplied with the relay
box using a hex driver (nominal designation: 4).
Chapter 5
Assembling
Cable connection to the motorized focus unit
81
FL
C
US
LISTED
4N75
INSPECTION
EQUIPMENT
ZOOM
NP
SMZ25
MADE IN JAPAN
Cable connection to the relay box
Assembling the relay box

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smz18

Table of Contents