Removal Of Electrical Box - Daikin FTXS20G2V1B Service Manual

G-series
Hide thumbs Also See for FTXS20G2V1B:
Table of Contents

Advertisement

SiENBE04-808_A
3.2

Removal of Electrical Box

Procedure
Step
1
Disconnect the
connector for the
overload protector
[S40].
2
Disconnect the
connector for the four
way valve coil [S80].
3
Disconnect the 2
connectors for the
reactor.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Outdoor Unit - RK(X)S20-35G2V1B9, ARXS20-35G3V1B
Preparation
„ Remove the panels and
[S40]
(R11846)
[S80]
(R11848)
(R11844)
Points
disconnect the connector for
the fan motor according to
the "Removal of Outer
Panels / Fan Motor".
218

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents