Download Print this page

Removal Of Electrical Box - Daikin RXF125KC Removal Procedure

2.5/3.5 kw class

Advertisement

Si001157

2. Removal of Electrical Box

Procedure
Step
1
Disconnect the 2
connectors for the
reactor.
Disconnect the relay
2
connector for the
compressor.
3
Disconnect the
connector for the
thermistors [S90].
Removal Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
[S90]
Removal of Electrical Box
Points
Preparation
Remove the panels and
disconnect the connector for
the fan motor according to
the "Removal of Outer
Panels / Fan Motor".
Rear: Brown
Front: White
(R12586)
(R15671)
When reassembling, coil the
excessive lead wire and
hang the loop on the hook.
(R15672)
9

Advertisement

loading

This manual is also suitable for:

Rxf135kcRzs235kcRzs235kcgRzs235kcpRzs235kcs