Removal Of Electrical Box - Daikin FVXG50KV2CW Service Manual

Table of Contents

Advertisement

Removal of Electrical Box

4. Removal of Electrical Box
Procedure
Step
Remove the screw of
1
the earth wire.
Remove the screws of
2
the terminal board and
disconnect the
connecting wires.
3
Remove the 2 screws
of the resin clamps.
Pull out the connecting
4
wires and the power
cable ASSY from the
holes of the electrical
box.
Release the harnesses
5
from the hook.
10
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Earth wire
Terminal board
Resin clamp
Power cable ASSY
(R13302)
Resin clamp
Connecting
wire
(R13303)
(R13304)
Si061063
Points
Remove the electrical box
cover according to "Removal
of Control PCB".
You can remove the
electrical box without
removing the control PCB.
Earth terminal: for indoor
heat exchanger
The resin clamp of the power
cable is fixed with a torx
tapping screw.
The harnesses are tied up
with clamps.
Removal Procedure

Advertisement

Table of Contents
loading

Table of Contents