Mitsubishi Electric GOT2000 Series User Manual page 128

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■2. GT21
Install the GOT in the following procedure.
For the panel cut dimensions for the GOT, refer to the following.
The following shows an installation example for the horizontal direction.
For the vertical installation, install the GOT so that the power supply terminal, which is located on the GOT rear face, is
at the lower side.
Step 1.
Install a packing to the packing installation groove on the GOT rear face.
6 - 14
6.5 Installing and Removing the GOT
For GT27 except GT2715-X GT25 and GT23 (4 fittings)
6.2 Panel Cut Dimensions
4.3 GT21
POINT
POINT
POINT
Cautions for an installation panel
Use a panel that has no warpage, damage, and unevenness on its surface. Failure to do so may
not result in waterproof effect.
Determine the panel thickness considering the panel strength.
(For example, even though the panel has thickness within the range, the strength may be
insufficient depending on the material and size. Insufficient panel strength may result in warpage
depending on the installation position of the GOT and other devices.)
Packing
Enlarge
Packing
Packing
installation groove

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents