Toshiba Tl000LE User Manual page 73

Table of Contents

Advertisement

3.16
RUNNING TEST
3.16.1 Program Description
This program automatically runs the following tests in sequence.
1.
FDD test (subtest number 02)
2.
HDD test (subtest number 01,05)
3.
System test (subtest number 01)
4.
Memory test (subtest number 04, 06, 07)
5.
Display test (subtest number 01 to 08)
6.
Printer test (subtest number 03)
7.
ASYNC test (subtest number 01)
When running an FDD test, this system automatically decides if there is one or two FDDs.
3.16.2 Operations
CAUTION: Do notforget to load a work disk. If a work disk is not loaded, an error
will be generated during the FDD testing.
1.
Remove the Diagnostics Disk and insert the work disk into the floppy disk drive.
2.
After pressing
2 and Enter in the DIAGNOSTICS MENU, the following message
will appear:
*
RUNNING TEST CONTROL MENU
*
Printer wrap around test (1:Yes/2:No)
?
If you select Yes (by typing in
1 and pressing Enter): The printer wraparound test
will be executed. A printer wraparound connector must be connected to the printer
connector on the back of the unit to properly execute this test.
If you select No (by typing in
2 and pressing Enter): The printer wraparound test will
not be executed.
3.
Type in
1 or 2 and press Enter. The following message will appear:
ASYNC wrap around test (1:Yes/2:No) ?
If you select Yes (by typing in
1 and pressing Enter): The ASYNC wraparound test
will be executed. An RS-232-C wraparound connector must be connected to the
COMMS connector on the back of the unit to properly execute this test.
3-39

Advertisement

Table of Contents
loading

Table of Contents