To Remove The Gas Flow Rate Controller; To Replace The Burner - Valor Homeflame Dream Installation And Owner's Manual

Model 961 inset live fuel effect gas fire
Table of Contents

Advertisement

INSTALLER GUIDE
When refitting the thermocouple and interrupter block, make sure that the microswitch
wires are properly secured to give a good electrical contact.

16.16 To remove the gas flow rate controller.

(See figure 50).
1. Remove the burner unit (See section
16.12).
2. If lying the burner on its back, ensure
that the work surface is suitably
protected. This will avoid damage to the
work surface.
3. Detach the shut-off tap as detailed in
section 16.15 paragraphs 2-6.
4. Detach the burner pipe from the
controller. Support the controller while
detaching to prevent excessive strain.
5. Remove the nut and washer securing
the control pivot bracket to the controller
at the front. Support the pivot bracket
while removing the nut to prevent
possible damage to the microswitch.
Figure 50. Flow rate controller
6. Remove the hexagonal bolt securing
the control pivot bracket to the controller
at the rear.
7. Detach the control pivot bracket.
8. Remove the hexagonal nut securing the controller to the front mounting bracket
and remove the flow rate controller.
9. Refit in the reverse order.

16.17 To replace the burner.

(See figure 51).
1. Remove the burner unit (See section 16.12).
2. Support the elbow injector and unscrew the
injector nut.
3. Remove the two screws from the burner clamping
plate (See figure 51).
4. Lift the right hand side of the burner, slide it to the
right and lift clear.
5. Refit in reverse order.
Figure 51. Removal of burner
© GDC Group Ltd. 2012
Page 45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents