Scheduling receptacles by day of the week
There are two types of schedules that you can set up for one day of the week. The two
setup procedures are described below.
All receptacles on and off:
Follow this procedure to select both the powering on and powering off times for all desired
receptacles on one day of the week.
1.
Click on a day of the week at the top of a column in the scheduling table. Two Set
Schedule For sections open, one for Power On and one for Power Off. These sections
contain pull-down menus for selecting powering on and off times as well as check boxes
for selecting the receptacles you want to schedule.
Figure 21.
Schedule Screen Showing Fields for Daily Receptacle Scheduling
2.
In either the Power On or Off section, select the hours, minutes, and
menus; and select the check boxes for the receptacles that you want to schedule.
3.
In the section in which you made your selections, click
section closes.
4.
If desired, repeat steps 2 and 3 in the other Set Schedule For section.
If you do not want to make selections in the remaining Set Schedule For section, click
Refresh
to close the section.
NOTE:
If you do not click
second field selections override those that you entered in the first.
5.
Repeat steps 1 through 4 for any additional days that you want to schedule.
Set
before making any selections in the other field, the
Set
IPL T PCS4 • HTML Configuration and Control
AM
or
PM
from the
to enter your choices. The
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip link ipl t pcs4i

Table of Contents